- The Superior Pile replacement for concrete piers and conventional screw piles.
Pile Installation
Our expert screw piling contractors provide affordable and durable pile installation for construction projects. Our industry-leading technology, managed by qualified engineers, has overseen 5,000+ successful projects across NSW.
Our proprietary software enables our estimators and engineers to monitor each installation live and in real-time, ensuring the structural integrity of pile foundations. A full job report details the depths and loads achieved. You also receive photos from the site after every job. Call us now for a prompt quote on your next project.
Cost-Effective
100% Safety Commitment
Same-Day Reports
Same-Day Reports
Types of Pile Installation Methods
Your business can use various types of piles, each offering distinct advantages.
The type you choose depends on your project’s requirements.
Screw Pile Installation
Screw piling provides end-bearing deep foundations that are quick to install with a minimum of noise and vibration. The piles are twisted into the ground with excavators. Our qualified installers measure and record torque readings of each pile installed using state-of-the-art calibrated digital equipment.
Helical Pile Installation
With a high load-bearing capacity, helical piles are suitable for developing many types of construction projects. Designed with steel shafts, this makes them highly versatile. These piles can be adapted to suit specific ground conditions.
Bored Pile Installation
Bored piles can support high loads on sites that may not suit screw piles. Such sites include those where rock is present at depths shallower than one metre. We are able to facilitate the drilling and pumping of concrete piers on sites that may not suit screw piles.
The Benefits of Pile Installation
Choosing Solid Metal Piling for your next construction project will save you time and money. There are extensive benefits for your business, but also for the local environment.
- Cutting-edge technology always in stock
Our galvanised piles provide a fast and robust construction solution. This includes piles suitable for severe corrosion sites. We hold extensive stocks of a broad range of screw-in piles in our NSW warehouses, there are no delays to your project. - Easy and fast installation methods
Foundation piles can be delivered, installed and signed off in a few hours. The process places less stress on a building site. They’re also efficient and versatile, with installation possible during inclement weather. - Game-changing sustainable construction
Our products limit greenhouse emissions. Transporting and installing the piles requires less energy than traditional techniques. No spoil is generated that needs to be removed and taken to landfills. This saves the builder thousands and takes large dump trucks off the road. At the end of a building’s life, the products are potentially reusable or 100% recyclable.
- Cost-savings
Installation is cost-effective. There’s no need for a cement pump or skid steer hire and there’s no spoil, which removes the need for concrete excavation and curing. - Versatile installations
The piles can be installed in a variety of soil conditions. They work especially well in shearing sandy soils that will see traditional bored pier holes collapse. They can even be installed in water tables and into the seabed near barges. - Matching Australian Standards compliance
Our products match AS2159-2009 and AS2870-2011 legislation for Australian standards compliance. We offer safety and quality to all of our customers. The company's manufacturer Blade Pile has obtained ISO accreditation.
Choose Solid Metal Piling as Your Expert Pile Installer
With over 12 years of experience in pile installation, we’ve overseen 5,000+ successful projects across Sydney and NSW. We offer our customers a transparent, reliable and streamlined process that delivers first-class results at cost-effective rates.
Your Complete Pile Installation Solution
Our comprehensive service offers a complete solution across engineering, designing, soil strength testing, corrosion classifying and certification. All to deliver pile foundations with maximum effectiveness.
Real-Time Reports for Data-driven Decisions
Live operating software logs all empirical data from your site. Data is relayed in reports detailing pile location, depth and total metres installed. Real-time monitoring from our construction and engineering teams ensures data-driven decision-making.
Cost-Effective Fees
Our competitive pricing is due to Blade Pile Group’s buying power and our extensive Sydney warehouse. We stockpile products to deliver premium quality. Our piles are 100% Australian-made from 450-grade steel.We offer a complete design and certification service for our valued distributor customer base.
Total Industry Compliance
We’re fully qualified installers who meet AS2159-2009 and AS2870-2011 Australian industry standards.
Process
Our Pile Installation Process: Four Steps to a Superior Foundation
Installation is seamless and can take as little as a few hours. Here’s our simple four-step methodology.
1. Site assessment and pile selection
Geotechnical conditions are assessed by our engineers. You’ll receive a quote on pile size requirements and the expected depths.
1. Site assessment and pile selection
2. Installation and data verification
The installation will begin with our qualified, licensed installers. Operating software verifies each pile so it matches specified loading needs.
2. Installation and data verification
3. Installation report and certification
We issue same-day installation reports on pile location, depth and total metres of installation. Within five to 10 days you’ll also receive third-party engineering certification on the structural integrity of your building.
3. Installation report and certification
4. Sign-off
Your foundation is complete! You can now begin a slab pour to take your construction project to its next phase.
4. Sign-off
Frequently Asked Questions
Piles are screwed into the ground using excavators with custom drive motors. The torsional forces required to advance the piles are measured by calibrated equipment. These torque readings accurately confirm the strength of the soil.
No. You’ll need fully qualified professionals to carry out this important construction requirement.
No. Solid Metal Piling designs all jobs to ensure the pile can meet the loads and last the minimum 50-year life required by AS2159 without filling with concrete.
Installing a pile will take around 5-10 minutes. It depends on the depth requirements but, usually, the job will be completed fast.