- The Superior Pile replacement for concrete piers and conventional screw piles.
Slip Joint Pile Caps Sydney NSW
Solid Metal Piling and its authorised affiliates are the only companies in NSW able to utilise a structural slip joint cap on a screw pile. This is a significant advantage for our customers. Screw piles finished flush with the RL of the pad, and not engaged in slabs and footings, must have the surface area enlarged to stop punching shear. In addition to achieving this, Blade Pile’s patented cap is also a structural slip joint.
Renowned piling products from NSW, we have completed over 5,000+ projects and uses high-density, long-life HDPE to ensure quality, longevity, and better protection for your structure. Contact us for a quote today.
Cost-Effective
100% Safety Commitment
Same-Day Reports
All-In-One Solutions
Our Pile Capping Technology
Slip Joint Pile Cap
Our leading product combines with the Blade Pile to create an AS2870-compliant system. It can be used to replace concrete bored piers and offers superior protection against hydraulic soil forces. Following installation the concrete slabs/footings are laid over the cap to provide a non-engaged, isolated load-bearing point. It can rise off, then re-seat, onto the screw piling during periods of hydraulic heave and shrink. That better protects the foundation.
Quality | Weight/Cap | Weight/Pack | L x W x H (mm) | |
---|---|---|---|---|
Single Pack | 10 | 400 Grams | 4.0 kgs | 630 x 400 x 180 |
Full Pallet | 600 | 400 Grams | 280.0 KG | 1000 x 1200 x 2200 |
Benefits of a Construction Pile Cap
This product offers your project an efficient, secure, and sustainable foundation that’s superior to traditional options.
Effective Load Distribution
This type of foundation has exceptional and even load transfer across individual foundation points. This reduces overall stress concentrations on the foundation by evenly spreading the load to prevent overloading the foundations.
Greater Structural Stability
Blade Piles slip joint pile cap enlarges the hollow 76mm tube to a flat 200mm surface area. This eliminates punching shear the tube alone would cause.
Efficiency and Versatility
They’re an ideal choice for an efficient construction process, one that saves time and money.
Long-Term Durability
The caps have a long lifespan and ensure the foundation system is durable and robust. It’s also easy to inspect the foundation system to ensure structural integrity. The caps are designed to last a 50-year build life and have been tested to eliminate punching shear at a load of 208 kN.
Choose Solid Metal Piling for Market-Leading Pile Cap Technology
Our products offer cost savings and efficiency over traditional foundations. They future-proof your structures, ensuring a solid foundation for decades ahead.
-
Proprietary Live Operating Software
We use advanced proprietary software to track and log on-site data to pinpoint the performance of your foundations. -
Competitive Pricing
Our fees are transparent and tailored to match individual projects. With our extensive decade-long experience in the sector, we can offer excellent pricing alongside our trademark quality installation processes. -
Matching Australian Standards Compliance
All Solid Metal Piling products match AS2159-2009 and AS2870-2011 legislation for Australian standards compliance. The slip joint pile cap is also fully compliant with AS2870 and is a like-for-like bored pier replacement. -
Installation Across NSW
We’re on hand for pile capping projects across NSW, including Sydney, Central Coast, Newcastle, Hunter Valley, Port Macquarie, Coffs Harbour, Tweed Heads, and Wollongong.
Process
The Pile Cap Installation Process
Our process is designed to be seamless and lay your new structure foundations as fast and efficiently as possible.
1. Enquire About a Quote
Once you get in touch with our team we can discuss your project. We offer expertise and transparency so you can get a strong understanding of the procedures and costs ahead.
1. Enquire About a Quote
2. Pile Cap Construction
With all the details down and your project ready to start, we’ll visit your site and begin the installation process. We work efficiently and can install with great accuracy.
2. Pile Cap Construction
3. Structural Integrity Analysis
Using our proprietary software we will perform checks on newly laid foundations and deliver a report on the structural integrity of your caps. With this feedback, we can ensure the durability and safety of your project.
3. Structural Integrity Analysis
4. Third-Party Certification
Once the installation is over you’ll receive a third-party engineering certification within 5 to 10 days. Then it’s on with the rest of your project.
4. Third-Party Certification
Frequently Asked Questions
It's a key component of this technology. The cap is an accessory that isolates the pile from the slab and acts as a structural slip joint.