Services

Experience The Blade Pile Difference

We know you’ll be impressed with the cost savings and efficiency improvements we will present over traditional concrete piers and old school screw piles. 

Pile sales and distribution

Solid Metal Piling is the exclusive master distributor of the Blade Pile Screw Pile system across NSW. We hold huge stocks of Blade Piles superior modular screw pile system in our Sydney warehouse that can support loads up to 150 kN SWL. We also have extensive stock holdings of GALV piles and extensions for severe corrosion sites. If you are installing screw piles now or have the plant and equipment required to install them, we’d love the opportunity to work with you. We offer a complete design and certification service for our valued distributor customer base.

Quotation and engineering

Our team considers your engineering plans and geotechnical information when estimating. We also leverage our expansive database of over 3500 similar projects we have completed across NSW in an attempt to design the most cost-effective piling solution for your project.

Pile Testing

In addition to our third-party consulting engineers, Solid Metal Piling has a team of inhouse expertly qualified piling engineers. We have the experience and capacity to provide supplementary support to your slab design engineers that will ensure design efficiencies are maximised. We offer soil strength testing confirmation, assistance in confirming corrosion classifications, site pile testing as well as fully supervised AS2159 compliant static load testing.

Complete Installations

We’ve installed well over 4000 jobs across the great NSW area since we’ve been running our proprietary software. We know what’s in store as chances are, we’ve been there before! Our crews use the latest cutting-edge equipment to measure the soil strength below each pile we install. This is how we guarantee a consistent load has been met with every installation. This is equipment is calibrated and recorded in accordance with all the relevant Australian standards and regulations.

Online Sign Offs & Reporting

Solid Metal Piling runs a proprietary live operating software system that sees all empirical data logged from site live. All jobs are monitored in real time via the internet and video link by our construction and engineering teams at the base. An installation report is generated and provided to our customers on completion of the installation that details all the locations, pile depths, total meters installation on the day of the job.

Third Party Certification

All our installation work is signed off by a consulting engineer who is completely separate to our business. It is our commitment to our customers that these third – party engineer certificates confirming the installation is to design and code, be made available to them within 7 days of the installation being completed. This will enable our builders to pour their slabs with 100% confidence every time.

Process

Our Process Is Unbeatable

The Blade Pile NSW process provides a full service piling solution for your next project, from quoting, to installation and certification, Blade Pile NSW has the entirety of your piling requirements covered from start to finish.

Quotation

Our in-house estimators and engineers review your design and geotechnical requirements to prepare a quote for your job. Also, we have our unique software "Pile Ops" and its extensive database of over 3000 logged jobs across NSW to determine the most cost-efficient pile size, blade size, and depth for your project.

1

Installation

Qualified installers are assigned to your job and use regularly calibrated equipment to measure and record torque readings for each individual pile as they are installed. Our installers enter the collected data into our operating software, and upon completion of your job, they sign a statutory declaration to verify its accuracy.

2

Data Assurance

This data provides assurance that the loads specified by your project engineer have been met for every pile. Unlike traditional bored piers that rely on visual inspections on-site, our system derives results from actual correlated torque achieved during installation, minimizing the risk of costly warranty repairs due to excessive settlement.

3

Installation Report

After your job is completed, you receive an installation report generated by our software, which provides details such as pile locations, depths, and total meters installed. This report is delivered on the same day as the installation.

4

FAST, Third Party Certification

We guarantee that the third-party engineering certificate, which validates the structural integrity of the installed piles, will be made available to you within 5 days of the installation.

5

Peace Of Mind

With the engineering certificate in hand, you can proceed with confidence to pour your slab, knowing that the piles have been installed according to the required specifications and standards.

6

Our Speciality Areas

Icon Image

Residential

Icon Image

Multi-residential

Icon Image

Light COmmercial